A37 – A14 Nguyen Chanh Project

Construction Scope: Waterproofing of the entire 30,000m2 area of the basement floor slab. Waterproofing of concrete joints. Leveling and reinforcing bored pile heads.

Completed Value: 6.5 billion VND

Completion Year: 2012

• Construction Scope: Supply and install waterproofing for the elevator shaft, wastewater treatment tank, basement walls, waterproofing of technical floor area, roof, and flowerbed.

• Completed Value: 3.5 billion VND

• Completion Year: 2019